Two FEMA map layers give opposite flood-zone answers across the same mapped building outline at 1535 Bargeway Road in The Dalles. The current effective Region X layer places it in Zone A and the Special Flood Hazard Area. FEMA’s April 18, 2025 revised preliminary layer places it in Zone X, an “area of minimal flood hazard,” outside the preliminary Special Flood Hazard Area.
That split can matter while a buyer is still evaluating financing, insurance, and planned work. It does not settle those questions. The current map still governs today, while the newer map shows a possible future classification worth putting in the file now.
OPB compared both FEMA layers against the entire building outline recorded as OpenStreetMap way 593102267. In each layer, one FEMA flood-hazard polygon covered the full OSM outline; this was a whole-polygon check, not a few point samples. OpenStreetMap is public, volunteered mapping—not a survey or an official property determination. The address is used only as an understandable public location for comparing map states, not as evidence about any owner, occupant, transaction, loan, policy, premium, permit, or flood history.
90-Second Oregon Property Decision Brief
What changed: The same OSM-mapped building outline reads Zone A/SFHA on FEMA’s effective map and Zone X/minimal flood hazard/non-SFHA on FEMA’s revised preliminary map.
What governs today: The City of The Dalles Floodplain Information Hub says the 1984 Flood Insurance Rate Maps continue to be used for floodplain permitting and review until the new maps are officially adopted.
Why a buyer’s file may still be open: A map label does not supply a building-specific lender determination, insurance price, City answer for proposed work, surveyed location, elevation evidence, or a complete map-change history.
A useful decision test: Ask whether the file contains four separate answers:
Which map controls today, and what does the revised preliminary map show?
What does the lender determine for the building securing the loan?
What does an insurance agent or carrier quote under the stated facts?
What does the City say about the buyer’s specific proposed work?

Use this card to keep four decision-makers from collapsing into one map screenshot. One missing written answer remains an open item.
If those answers conflict or remain missing, the map assumption is still unresolved. The right conclusion is not automatically favorable or adverse; it is that the file needs a clearly labeled open item.
What the full-building comparison shows
The current effective feature covering the entire OSM outline is Zone A, marked as inside the Special Flood Hazard Area and sourced to the September 24, 1984 Wasco County FIRM. The revised preliminary feature covering that same outline is Zone X, subtype “area of minimal flood hazard,” marked outside the preliminary SFHA and tied to the April 18, 2025 revised product.

Source visual: archived FEMA Region X effective and revised preliminary GIS geometry with OpenStreetMap way 593102267, checked September 27, 2026. A full-polygon audit found one FEMA feature covering the complete OSM outline in each layer. OSM is not a survey, the preliminary map is not controlling, and this does not determine an applicable LOMC, lender result, premium, permit outcome, flood occurrence, or value.
This is stronger than dropping a pin near a building. A point can miss a boundary crossing that affects another part of the mapped outline. Here, the audit tested the complete OSM polygon and found no second flood-hazard feature intersecting it in either query.
The precision boundary still matters: the result is exact for the OSM polygon used in the query, but the OSM polygon itself is not survey-grade. A property file may also need an applicable Letter of Map Amendment or Revision, an Elevation Certificate, a FEMA Property Identification Map, or another authoritative property-specific record. A fresh FEMA screen found no map-change record identified with this address or footprint, but that is a strong screen rather than a categorical finding that none applies.
The practical reading is straightforward: the preliminary layer contains a favorable signal, while the effective layer remains today’s official map answer. Neither layer supplies every transaction answer.
The filled two-map decision file
Instead of treating “flood zone” as one question, separate the evidence into four lanes.
1. Map lane — filled
Public location tested: OSM-mapped building at 1535 Bargeway Road.
Current effective result: full OSM outline covered by Zone A/SFHA.
Revised preliminary result: full OSM outline covered by Zone X, area of minimal flood hazard/non-SFHA.
Current status: maps disagree; the Zone X depiction remains preliminary.
Property-level items still worth checking: authoritative building location, elevation records, and applicable LOMA/LOMR/LOMR-F history.
2. Lender lane — building-specific answer needed
The federal interagency flood-insurance Q&A ties the federal mandatory-purchase analysis to a qualifying loan secured by a building in a Special Flood Hazard Area. That is why a parcel-level screenshot is not a substitute for the lender’s building-specific determination. A lender may also have requirements broader than the federal minimum.
For this public example, OPB has no loan facts and makes no claim about lender treatment. In a real file, the useful artifact is the written determination and its map/effective-date basis—not an assumption drawn from the preliminary layer.
3. Insurance lane — price is separate from zone
FEMA’s Risk Rating 2.0 explanation says pricing incorporates property-level flood risk and rebuilding variables beyond a single zone label. A move from an effective Zone A depiction to a future Zone X depiction would therefore not, by itself, calculate a premium or establish whether maintaining coverage makes sense.
The map answers “how this layer classifies the location.” A quote answers “what coverage costs under these facts.” Keep both.
4. City lane — the project description matters
The City says the existing 1984 maps remain in use for floodplain permitting and review until official adoption. Its SFHA Development Guidelines describe materials that can be relevant when work is governed as floodplain development, including site plans, elevations, flood-zone information, utility protection, engineering for some work, and later certifications.
That guidance is a menu, not a finding about 1535 Bargeway Road. A useful City inquiry identifies the actual work—such as an addition, remodel, fill, utilities, or change of use—and asks which map and submittals staff would apply to that proposal.
How the answer changes the transaction file
A buyer’s agent does not need to predict the final map to organize the decision. The evidence can be sorted into three branches.
Favorable branch
The replacement map becomes effective with the secured building outside the SFHA, and the lender’s written determination reflects that result. The file can then record what changed in the financing requirement. Insurance pricing and the City’s treatment of proposed work still receive their own answers.
Adverse branch
The effective map places the secured building—or the area of proposed development—inside an SFHA or floodway, and the relevant lender or City response identifies a consequence. The file then has a defined issue to evaluate: a coverage requirement, a quote, additional permit materials, or more elevation/engineering evidence. The map label alone does not provide the cost, schedule, or feasibility conclusion.
Transition branch — where this example sits
The public layers disagree, the newer layer is preliminary, and the building-specific lender, insurance, City-project, and authoritative property records are not part of this example. That makes transition the supportable classification today, with a favorable preliminary direction.
This branch is useful because it prevents two common overreactions. “The building is leaving the floodplain” treats a preliminary line as final. “Nothing has changed” ignores a documented federal map revision that could shape later decisions. The accurate middle is not a guess: it is a dated map comparison plus a short list of unresolved decision-makers and records.
The local adoption process and FEMA’s federal effective-date process answer different timing questions.
Oregon DLCD’s notice for The Dalles file 003-26 says the proposal would replace the 1984 FIRMs and associated SFHA boundaries. The notice lists a November 5, 2026 first hearing and leaves the final-hearing field blank. That documents a proposed local proceeding, rather than completed adoption.

The local hearing/adoption track and FEMA’s federal effective-date track are related but not interchangeable. Record the hearing, issued LFD, and final effective map as separate milestones.
FEMA’s Letter of Final Determination process says an issued LFD states that updated maps will become effective in six months. As of OPB’s September 27 research cutoff, an issued Wasco/The Dalles LFD and exact federal effective date had not been verified. The City’s spring 2027 forecast is a planning signal, not the exact federal date.
A clean timeline therefore records the local hearing/adoption materials, the eventual LFD, and the final effective map as distinct milestones.
A client-safe explanation
“The current FEMA map still governs the City’s floodplain review. The revised preliminary map shows a potentially favorable change across the mapped building outline, but it is not effective yet. The lender, insurer, and City each answer a different question, so we are tracking those answers separately.”
That wording gives the preliminary map appropriate weight without converting it into a financing, price, or permitting promise.
Watch Next
Watch for three connected developments: an issued Wasco/The Dalles Letter of Final Determination, the exact FEMA effective date and final map, and the City’s completed adoption materials. When the final map is available, rerun the same full-building comparison and update the lender and City lanes with current written answers.
Which part of this four-lane file is hardest to obtain in practice: authoritative property mapping, the City response, the lender determination, or the insurance quote? Reply and tell OPB where the process slows down.
Know an Oregon buyer, owner, agent, lender, or contractor who would use this example? Forward this issue to them.
If you found this useful, subscribe to Oregon Property Brief so you don’t miss the next Oregon property signal.